Work to our school site:
Following the water damage to areas of Millfield’s site earlier in the Autumn Term, I’m thrilled to share an update. Fortunately, the flooring has dried out and necessary groundwork has been completed. Over the February half term break, carpets will be laid through the school entrance, offices and relevant hallways. After half term, we will be focusing our attention on the hall floor with the aim of having new flooring installed as soon as possible. I’d like to take this opportunity to thank children and school adults for their flexibility during this period of change within our school environment.